| Additional Information | : | 0 to 30 min Adjustable Delay/Pump Down Cycle |
| Adjustable Defrost Initiation | : | 1-8 cycles per day; minimum 3 hours between successive cycles |
| Adjustable Defrost Time | : | 3 to 45 min |
| Adjustable Delay or Pump Down Cycle | : | 0-30 minutes; 3 minute graduation: for stopping fans, reducing refrigerant pressure, or hot gas pum |
| Adjustable Drain or Fan Delay Cycle | : | 3-15 minutes; 3 minute graduation |
| Adjustable Length of Defrost | : | 3-45 minutes; 3 minute graduation |
| Agency Rating | : | RU Recognized|CSA |
| Configuration | : | 2NO-2NC |
| Defrost Initiation | : | 1 to 8 Cycles per Day |
| Dimensions | : | 9 in L x 4.6 in W x 4.3 in H |
| Electrical Rating | : | 120V AC |
| Enclosure | : | Heavy-Duty Steel |
| High Pressure (Open High) Cut-Out | : | 4.75 (2.2) |
| Material | : | Steel |
| Product Height | : | 4.3 in |
| Product Length | : | 9 in |
| Product Width | : | 4.6 in |
| Sequence Switching | : | 2 NO 2 NC |
| Series Application | : | Defrost Timers |
| Series | : | 632 Series |
| Switch Rating | : | 120-240 V, 10 A, 245 VA |
| Voltage Rating | : | 120 V |
The Paragon 632 Series Defrost Timer provides an adjustable cycle, time initiated, with one to 8 On/Off operations daily with a minimum of three hours between operations.
PARAGON® Defrost Timer, Series: 632, 120 V, 3 to 45 min Adjustable Defrost Time, Configuration: 2NO-2NC, Switch Rating: 120-240 V, 10 A, 245 VA, 1 to 8 Cycles per Day Defrost Initiation, Steel, 9 in L x 4.6 in W x 4.3 in H, Additional Information: 0 to 30 min Adjustable Delay/Pump Down Cycle
- Adjustable delay or pump down cycle
- Drain or fan delay cycle adjustable
- Defrost initiation and length adjustable